Water Power Solution Case Studies

Utilities Power Solution Case Studies

CCTV and Security Systems AC UPS

A national leader in mechanical and electrical engineering based in Burton-upon-Trent WT Parker has over 90 years experience providing design, estimating and installation of electrical and mechanical building services, including network communications, FM services, testing and inspection as well as the harnessing of renewable energy sources.

Read more

Bamford Water Treatment Works

Situated in the Peak District Bamford Water Treatment Works is Severn Trent Water’s third largest treatment works, supplying drinking water to Derby, Nottingham and Leicester.

Read more

1-3 kVA UPS in Wall Mounted IP54 Enclosures

The Cema Group started as CEMA Ltd, in 1987 in Nottingham.

Read more

3 phase 20kVA IP54 AC UPS systems

Harland Simon provided 3 phase 20kVA IP54 AC UPS systems at Bolton WWTW.

Read more

3 Phase and 1 Phase IP54 UPS Systems

Harland Simon provided three phase high power UPS for the valves and single phase UPS for the support and monitoring equipment at Bromborough WWTW.

Read more